The artificial turf which was constructed by Wembley Sports Construction Limited (WSCCL) and estimated to cost over $90,000 including fencing , becomes the latest turf in Accra adding up to the numerous parks constructed by Wembley as the company envisage to have its turf in every school in Ghana.
Read moreHow long does it take to build a 3G pitch?
Once planning is granted and the construction programme agreed, the typical length of time on-site to construct a new artificial football pitch is generally 12-14 weeks , with football pitch resurfacing in the region of 6-8 weeks.
Read moreAre you allowed 3G pitches in the Football League?
Recently the Conference League changed its rules to allow synthetic 3G pitches to be allowed in the Conference National League , (the League that feeds into the Football League). This follows on from the FA’s decision in 2014 to allow artificial surfaces to be used in all rounds of the FA Cup.
Read moreWhat is a 3G football pitch?
3G stands for a Third Generation synthetic surface which consists of three elements; synthetic turf, sand infill and rubber infill. These surfaces are typically between 35mm-65mm in pile height. Primary sports played on these types of surfaces are Football, Rugby Union, Rugby League, Lacrosse and American Football.
Read moreIs a hockey pitch 3G?
3G surfaces are designed primarily for football and rugby and England Hockey does not consider it suitable for competitive hockey .
Read moreHow long does it take to lay a 3G pitch?
Once planning is granted and the construction programme agreed, the typical length of time on-site to construct a new artificial football pitch is generally 12-14 weeks , with football pitch resurfacing in the region of 6-8 weeks.
Read moreWhat pitch is 3G?
3G Pitches 3G stands for a Third Generation synthetic surface which consists of three elements; synthetic turf, sand infill and rubber infill. These surfaces are typically between 35mm-65mm in pile height.
Read more